Spring measure kit
Rigid ruler and visual guide.
Step 1
Create a local project record. No account is required for the free beta.
Tell us who is using the tool and what the door is doing.
Step 2
Stay on the floor when possible, use camera zoom, and keep hands and tools out of the spring/cable area.
The frame turns green when resolution and lighting are usable. It does not approve the repair.
Step 3
A direct ruler reading is the primary measurement. A known-size object is only a secondary photo reference because perspective can distort scale.
Pick the closest route. You can switch without losing the saved project.
Measure the length of 20 consecutive coils. Do not enter the danger zone or move, unwind, loosen, or remove hardware to obtain a reading.
Step 4
The public beta builds a candidate list. It does not authorize high-tension work or take payment.
Confirm what you have before collecting identification evidence.
Professional-only readiness record. A checked box does not verify training or unlock high-tension instructions.
Exact spring and professional tool availability will connect to your supplier/Stripe catalog later.
Rigid ruler and visual guide.
Dimensions and configuration attached to the request.
Bar diameter must match approved winding hardware.
Professional workflow tool; not permission to perform spring work.
Compare a matched 25k, 50k, or higher-cycle package. Never selected from length alone.
Stem, diameter, count, track, and hinge photos required.
Retainer profile and door width required. Bottom-fixture work stays pro-only.
Opener brand, model, connector, and current sensor photos required.
ZIP-based pickup or partner delivery for items impractical to parcel-ship.
Step 5
Free beta guidance is available now. Private walkthrough video playback will use expiring Access IDs after Cloudflare Stream and payments are connected.
Beta access validation is not active yet. Production IDs will start their 48-hour or seven-day clock when first opened.
System-specific guide
Use current local quotes; do not present an old national average as a live price.
Video titles can be visible publicly; the actual video and detailed gated workflow remain private.
Free checklist • alignment evidence • final obstruction/reversal test
Model identification • manufacturer path • completion proof
Compatibility • power boundary • programming and final test
Verified lane • model-specific manual • electrical isolation evidence
Door identity • exact section match • structural and tension boundaries
Free measurements and parts request; high-tension procedure is verified-pro only
Open identification guideFuture verified lane • opening/site survey • manufacturer installation plan
Step 6
The project stays open until all relevant checks are captured. Never stand or place an object under a moving door for a test.
Use this after the mechanical work and visual checks are complete—not while identifying or working around loaded hardware.
Only perform tests permitted by the manufacturer and within your qualifications. Stop if movement is uneven, noisy, jerky, unstable, or cables appear loose.